Mere 22000 rupye le liya please refund my money

————————————————————————————————

ATUL TIWARI

Mobile: + 9415055345 ~ E-Mail: [email protected],[email protected]

Seeking senior level positions in Electrical Operations & Maintenance, Erection & Commissioning AFBC AND CFBC Boiler of Thermal power plant, Turbines with a reputed organisation in the Power Generation industry.

 

Professional Digest

 

  • Offering over 16 years of experience in the field of Operations & Maintenance, Erection and Commissioning of electrical equipment.
  • Specialist experience in handling overall electrical operation & maintenance of Power Plants.
  • Thorough knowledge of operations and maintenance of thermal power stations in the field of electrical
  • Capability to deal with legal matters pertaining to the departmental needs and resolve the matters amicably. Knowledge of drafting all legal letters pertaining the Government Audit as per statutory requirements.
  • An effective communicator with strong people management, analytical and coordination skills.
  • Knowledge of ABT( Availability Base Tariff) and UI calculation of power export.
  • Continuous Monitoring and help to control desk operator regarding the load increase or decrease according to System Frequency

 

Organisational Experience

 

Since Dec’7/2011 with Bajaj Energy Pvt ltd (Utraula UP)  Deputy Manager – Power Plant in 2×45 MW IPP

Reporting to Unit Head

 

Role:

  • Responsible for annual maintenance budgeting & evaluating of schemes related to Gross Capital Investment / Gross Capital Flow. (Budget Dimensions – Capital : Rs. 20 Lacs & Maintenance : Rs. 77 Lacs per Annum)
  • Looking after job evaluation of various electrical equipment positions driven by quality, cost, delivery, innovation, & productivity parameters, identification of departmental key performance areas & key result areas for various electrical positions.
  • Preparing MIS for monthly and quarterly review.
  • Ensuring report generation and maintenance of History Sheet, Deviation sheets.
  • Carrying out preventive maintenance management & generation of exception reports.
  • Reviewing routine maintenance according to the norms decided for ISO 9001.
  • Maintaining relay coordination with authorized agencies.
  • Interfacing with Electrical Inspector for electrical inspection of all electrical equipment.
  • DC management and monitoring Power evocation according to SG/AG
  • Lisioning with UPPCL to maintain the transmission line
  • Continuous monitoring of Reactive Power during power evocation as per Grid Requirement.
  • Use SAP PM and MM module and preparing PM notification and apply maintenance order and closed up WOCO and TECHO.
  • Maintain the critical spare of Turbine, Generator ,AVR, Protection relays
  • Maintenance of OLTC of 56.25 MVA
  • Maintenance of 132 KV switch Yard

 

The Highlights:

  • Carried out erection of commissioning of:
    • Various electrical switch gears in project time.
    • LT& HT panel.
    • 100HP & 75 Hp Inverter Drives.
    • LT& HT Motor’s.
  • Followed up check list as per WCM requirement.
  • Maintained distribution Transformer and involved in planning & budgetary controls, MIS, review & techno-commercial evaluation of Annual Rate Contracts, AMCs, etc.
  • Successfully completed the electrical erection and commissioning of viscose section with in stipulated time (FY07 and FY08) it is world record with in a group which has been completed the project in one year.
  • Maintained All Equipment history in SAP.
  • Significantly modification in critical equipment by providing JB with copper flexible cable near the Motor to reduce the Failure of motor.

 

 

 

 

 

 

Preceding Assignments

 

Nov‘96 – Nov’11 with Birla Cellulosic, a Unit of Grasim Industries Ltd., Kharach, Dist. Bharuch, Gujarat as Assistant Manager ­ Power Plant (Electrical)

Joined as Assist Engineer (E&I) and rose to the post of Assistant Manager – Power Plant (Electrical)

 

Apr’02 – Nov’06 with Self Electrical work, Sitapur as Proprietor – Electrical equipment selling & installation

 

May’95 – Oct’96 with Vishal Electrical Co. Pvt. Ltd., Ujjain as Resident Engineer

 

Jan’93 – Apr’95 with Eltech Engineers & Consultants (BBY) Pvt. Ltd., Banjari Cement Ltd Bihar as Site Engineer

 

Dec’91 – Dec’92 with LESU, 33/11KV Substation, Lucknow as Apprentice JE (Electrical)

 

Academics

 

1991        Diploma in Electrical Engineering from Hewett Polytechnic Lucknow with 70.0%.

1988        Intermediate from Govt. Inter College, Sitapur.

1984        High School Govt. Inter College, Sitapur.

2013        MBA in Power   Management with (UBI Delhi)

 

Computer Skills

 

  • Operating System: Windows 2007 Professional, Office 2000.

 

Personal Details

 

Date of Birth:                1st December, 1970.

Current Address:           A 135 Avas Vikas Colony  Sitapur 261001, U.P.

Language Known:          English, Hindi and Gujarati.

 

 


Post your reviews / feedback or experience by clicking on the following submit complaint button.
Frustrated?

Leave a Comment

Your email address will not be published. Required fields are marked *